RailBeeps offered in:हिन्दी

AVD-MMC (66000) Route, Time Table, Schedule

  • Name
  • AVD-MMC
  • Number
  • 66000
Advertisement

66000 Avd-mmc is a Memu (MEMU) which is running between Avadi (AVD) and Moore Market (MMCC). Avd-mmc covers total journey of 20 kilometers. At 04:40 it departs from Avadi and at 05:25 it arrives at Moore Market. 66000 Avd-mmc has total 7 stopping station like AMBATTUR (ABU), VILLIVAKKAM (VLK), PERAMBUR (PER) etc. between both source and destination stations. Check here 66000 Running status

  • Last one week running status of the AVD-MMC
  • 19th February
  • RT
  • 4th January
  • RT
  • 3rd January
  • 2nd January
  • 1st January
  • RT
  • 31st December
  • 30th December
  • 29th December
  • Train Avg. speed
  • 27 km/hr
  • Journey Distance
  • 20Km.
  • Train Travel Time
  • 45 Min.
  • Type of Train
  • MEMU (MEMU)
  • Train Running schedule
  • Daily (All Days)

AVD-MMC - 66000 Train Schedule

  • Stations
  • Arrival
  • Departure
  • Halt
  • Distance
  • Day
  • Stations AVADI
  • Arrival starts
  • Departure 04:40
  • Halt -
  • Distance -
  • Day 1
  • Stations AMBATTUR
  • Arrival 04:49
  • Departure 04:50
  • Halt 1 m
  • Distance 6 km
  • Day 1
  • Stations VILLIVAKKAM
  • Arrival 04:59
  • Departure 05:00
  • Halt 1 m
  • Distance 12 km
  • Day 1
  • Stations PERAMBUR
  • Arrival 05:06
  • Departure 05:07
  • Halt 1 m
  • Distance 15 km
  • Day 1
  • Stations VYASARPADI
  • Arrival 05:08
  • Departure 05:09
  • Halt 1 m
  • Distance 17 km
  • Day 1
  • Stations BASIN BRIDGE JN
  • Arrival 05:11
  • Departure 05:12
  • Halt 1 m
  • Distance 19 km
  • Day 1
  • Stations MOORE MARKET
  • Arrival 05:25
  • Departure Ends
  • Halt -
  • Distance 20 km
  • Day 1

Frequently Asked Questions

What time AVD-MMC depart from AVADI Railway Station?

AVD-MMC (66000) departs from AVADI Railway Station at 04:40.

How much time AVD-MMC take to reach MOORE MARKET Railway Station?

AVD-MMC reach on day 1 to MOORE MARKET Railway Station. The arrival time of AVD-MMC at MOORE MARKET Railway Station is 05:25.

Distance covered by AVD-MMC?

AVD-MMC covers 20 km to reach MOORE MARKET Railway Station at average speed of 27 km/hr. AVD-MMC passes through 7 stations.

Related train running from same Source

  • Name
  • Number
  • Source
  • Destination
  • Runs on

Related train running from same Destination

  • Name
  • Number
  • Source
  • Destination
  • Runs on