Rail Minister Ashwini Vaishnaw
- All
- News
- Videos
-
Mumbai-Ahmedabad Bullet Train To Be Operational By 2029, Surat-Bilimora Section Ready By 2027
- Saturday September 27, 2025
- India News | Indo-Asian News Service
The Mumbai-Ahmedabad bullet train will be operational by 2029, and the 50-km stretch of India's first high-speed rail corridor between Surat and Bilimora in Gujarat is expected to open by 2027, Union Railways Minister Ashwini Vaishnaw said
-
www.ndtv.com
-
Chenab Rail Bridge To Atal Tunnel: Minister Shares India's Engineering Feats
- Monday September 15, 2025
- India News | Edited by NDTV News Desk
Ashwini Vaishnaw shed light on how Indian engineers were turning challenges into milestones.
-
www.ndtv.com
-
Indian Railways To Run 12,000 Special Trains For Diwali-Chhath Travel Rush: Routes And Booking Details
- Thursday August 21, 2025
- Travel | Edited by Somdatta Saha
Railway Minister Ashwini Vaishnaw said the move is part of efforts to make festive travel more convenient and accessible.
-
www.ndtv.com/travel
-
Centre Approves Phase-IB Of Lucknow Metro At Cost Of Rs 5,801 Crore
- Tuesday August 12, 2025
- India News | Press Trust of India
The Union Cabinet approved Phase-IB of the Lucknow Metro project with a corridor length of 11.165 km at a cost of Rs 5,801 crore, Railway Minister Ashwini Vaishnaw said.
-
www.ndtv.com
-
Rs 10,000 Crore Sanctioned In Union Budget For Bihar Rail Network: Ashwini Vaishnaw
- Monday July 7, 2025
- India News | Press Trust of India
Railway Minister Ashwini Vaishnaw on Monday said Rs 10,000 crore has been sanctioned in this year's Union Budget for strengthening rail infrastructure in Bihar.
-
www.ndtv.com
-
Railway Minister Shares 8 Features Of Katra Srinagar Rail Link
- Friday June 6, 2025
- India News | Press Trust of India
With the flagging of the Katra-Srinagar Vande Bharat Express by Prime Minister Narendra Modi, Railway Minister Ashwini Vaishnaw on Friday shared eight notable features of the Udhampur-Srinagar-Baramulla Rail Link (USBRL) project.
-
www.ndtv.com
-
"200 New Vande Bharat Trains In Next 2-3 Years": Ashwini Vaishnaw After Budget Allocation
- Saturday February 1, 2025
- Business News | Indo-Asian News Service
Calling the Union Budget 2025-26 "amazing", Union Railways and Electronics and IT Minister, Ashwini Vaishnaw on Saturday said that with the big allocation to it, Indian Railways is all set to expand faster, safer and comfortable rail travel.
-
www.ndtv.com
-
Electric Engine Rolls Through India's First Cable-Stayed Rail Bridge In J&K
- Wednesday December 25, 2024
- India News | Press Trust of India
Railways has conducted a trial run of an electric engine on India's first cable-stayed rail bridge, the Anji Khad Bridge, in Jammu and Kashmir's Reasi district.
-
www.ndtv.com
-
Ashwini Vaishnaw Inspects New Ganga Rail Bridge In Prayagraj For Maha Kumbh 2025
- Monday December 16, 2024
- India News | Edited by NDTV News Desk
Union Railway Minister Ashwini Vaishnaw on Sunday conducted an inspection of the newly constructed Ganga Rail Bridge at Prayagraj, Uttar Pradesh.
-
www.ndtv.com
-
"Historic Milestone" Achieved In Udhampur-Srinagar-Baramulla Rail Link: Minister
- Friday December 13, 2024
- India News | Edited by NDTV News Desk
The USBRL project has been a monumental undertaking, initially sanctioned in 1994-95, and is now on the verge of completion.
-
www.ndtv.com
-
"Bharat's First": Ashwini Vaishnaw Shares Video Of Hyperloop Test Track
- Friday December 6, 2024
- Feature | Edited by Nikhil Pandey
Union Railway Minister Ashwini Vaishnaw unveiled India's first 410-meter Hyperloop test track at IIT Madras' Discovery Campus in Thaiyur.
-
www.ndtv.com
-
"In Touch With NIA, Top Cops...": Railway Minister On Threats To Rail Safety
- Tuesday September 24, 2024
- India News | Edited by Debanish Achom
Railway Minister Ashwini Vaishnaw today said the government will take strong action against anyone caught throwing stones on trains.
-
www.ndtv.com
-
"Huge Focus On Safety": Railways Minister's Report On Modi 3.0's 100 Days
- Tuesday September 17, 2024
- India News | Reported by Vasudha Venugopal, Edited by Saikat Kumar Bose
The Narendra Modi government has set an aggressive target for implementing the Kavach train protection system across the rail network in the next five to six years, Railways Minister Ashwini Vaishnaw told NDTV as Modi 3.0 completed 100 days.
-
www.ndtv.com
-
Cabinet Committee Approves 309 Km Long New Mumbai-Indore Railway Line
- Monday September 2, 2024
- India News | Press Trust of India
The Cabinet Committee on Economic Affairs on Monday approved a 309 km new line project providing the shortest rail connectivity between the two major commercial hubs of Mumbai and Indore, Union Minister Ashwini Vaishnaw said.
-
www.ndtv.com
-
Cabinet Okays 8 New Rail Line Projects Covering 14 Districts In 7 states
- Friday August 9, 2024
- India News | Press Trust of India
The Cabinet Committee on Economic Affairs, chaired by Prime Minister Narendra Modi, approved eight railway projects with total estimated cost of Rs 24,657 crore, Railway Minister Ashwini Vaishnaw said on Friday.
-
www.ndtv.com
-
Mumbai-Ahmedabad Bullet Train To Be Operational By 2029, Surat-Bilimora Section Ready By 2027
- Saturday September 27, 2025
- India News | Indo-Asian News Service
The Mumbai-Ahmedabad bullet train will be operational by 2029, and the 50-km stretch of India's first high-speed rail corridor between Surat and Bilimora in Gujarat is expected to open by 2027, Union Railways Minister Ashwini Vaishnaw said
-
www.ndtv.com
-
Chenab Rail Bridge To Atal Tunnel: Minister Shares India's Engineering Feats
- Monday September 15, 2025
- India News | Edited by NDTV News Desk
Ashwini Vaishnaw shed light on how Indian engineers were turning challenges into milestones.
-
www.ndtv.com
-
Indian Railways To Run 12,000 Special Trains For Diwali-Chhath Travel Rush: Routes And Booking Details
- Thursday August 21, 2025
- Travel | Edited by Somdatta Saha
Railway Minister Ashwini Vaishnaw said the move is part of efforts to make festive travel more convenient and accessible.
-
www.ndtv.com/travel
-
Centre Approves Phase-IB Of Lucknow Metro At Cost Of Rs 5,801 Crore
- Tuesday August 12, 2025
- India News | Press Trust of India
The Union Cabinet approved Phase-IB of the Lucknow Metro project with a corridor length of 11.165 km at a cost of Rs 5,801 crore, Railway Minister Ashwini Vaishnaw said.
-
www.ndtv.com
-
Rs 10,000 Crore Sanctioned In Union Budget For Bihar Rail Network: Ashwini Vaishnaw
- Monday July 7, 2025
- India News | Press Trust of India
Railway Minister Ashwini Vaishnaw on Monday said Rs 10,000 crore has been sanctioned in this year's Union Budget for strengthening rail infrastructure in Bihar.
-
www.ndtv.com
-
Railway Minister Shares 8 Features Of Katra Srinagar Rail Link
- Friday June 6, 2025
- India News | Press Trust of India
With the flagging of the Katra-Srinagar Vande Bharat Express by Prime Minister Narendra Modi, Railway Minister Ashwini Vaishnaw on Friday shared eight notable features of the Udhampur-Srinagar-Baramulla Rail Link (USBRL) project.
-
www.ndtv.com
-
"200 New Vande Bharat Trains In Next 2-3 Years": Ashwini Vaishnaw After Budget Allocation
- Saturday February 1, 2025
- Business News | Indo-Asian News Service
Calling the Union Budget 2025-26 "amazing", Union Railways and Electronics and IT Minister, Ashwini Vaishnaw on Saturday said that with the big allocation to it, Indian Railways is all set to expand faster, safer and comfortable rail travel.
-
www.ndtv.com
-
Electric Engine Rolls Through India's First Cable-Stayed Rail Bridge In J&K
- Wednesday December 25, 2024
- India News | Press Trust of India
Railways has conducted a trial run of an electric engine on India's first cable-stayed rail bridge, the Anji Khad Bridge, in Jammu and Kashmir's Reasi district.
-
www.ndtv.com
-
Ashwini Vaishnaw Inspects New Ganga Rail Bridge In Prayagraj For Maha Kumbh 2025
- Monday December 16, 2024
- India News | Edited by NDTV News Desk
Union Railway Minister Ashwini Vaishnaw on Sunday conducted an inspection of the newly constructed Ganga Rail Bridge at Prayagraj, Uttar Pradesh.
-
www.ndtv.com
-
"Historic Milestone" Achieved In Udhampur-Srinagar-Baramulla Rail Link: Minister
- Friday December 13, 2024
- India News | Edited by NDTV News Desk
The USBRL project has been a monumental undertaking, initially sanctioned in 1994-95, and is now on the verge of completion.
-
www.ndtv.com
-
"Bharat's First": Ashwini Vaishnaw Shares Video Of Hyperloop Test Track
- Friday December 6, 2024
- Feature | Edited by Nikhil Pandey
Union Railway Minister Ashwini Vaishnaw unveiled India's first 410-meter Hyperloop test track at IIT Madras' Discovery Campus in Thaiyur.
-
www.ndtv.com
-
"In Touch With NIA, Top Cops...": Railway Minister On Threats To Rail Safety
- Tuesday September 24, 2024
- India News | Edited by Debanish Achom
Railway Minister Ashwini Vaishnaw today said the government will take strong action against anyone caught throwing stones on trains.
-
www.ndtv.com
-
"Huge Focus On Safety": Railways Minister's Report On Modi 3.0's 100 Days
- Tuesday September 17, 2024
- India News | Reported by Vasudha Venugopal, Edited by Saikat Kumar Bose
The Narendra Modi government has set an aggressive target for implementing the Kavach train protection system across the rail network in the next five to six years, Railways Minister Ashwini Vaishnaw told NDTV as Modi 3.0 completed 100 days.
-
www.ndtv.com
-
Cabinet Committee Approves 309 Km Long New Mumbai-Indore Railway Line
- Monday September 2, 2024
- India News | Press Trust of India
The Cabinet Committee on Economic Affairs on Monday approved a 309 km new line project providing the shortest rail connectivity between the two major commercial hubs of Mumbai and Indore, Union Minister Ashwini Vaishnaw said.
-
www.ndtv.com
-
Cabinet Okays 8 New Rail Line Projects Covering 14 Districts In 7 states
- Friday August 9, 2024
- India News | Press Trust of India
The Cabinet Committee on Economic Affairs, chaired by Prime Minister Narendra Modi, approved eight railway projects with total estimated cost of Rs 24,657 crore, Railway Minister Ashwini Vaishnaw said on Friday.
-
www.ndtv.com