Nepal Will Soon Be Just An 8-Hour Drive From Delhi

Delhi to Nepal in just 8 hours? The Gorakhpur-Sonauli highway is 89% done, and once it opens, that frustrating border crossing could finally get a whole lot faster.

Advertisement
Read Time: 3 mins
A smoother road to Nepal is almost here.
Photo: Pexels
Quick Read
Summary is AI-generated, newsroom-reviewed
  • The Gorakhpur-Sonauli four-lane highway project is 89% complete
  • The new highway will ease travel to Nepal from Delhi, UP, and Bihar
  • It replaces a two-lane road prone to traffic jams and slow movement
Did our AI summary help?
Let us know.

One of India's biggest international highway projects is now in its final stages. Around 89% of the work on the new four-lane Gorakhpur-Sonauli National Highway (NH-24) has already been completed. Once it opens, it will make travelling to Nepal much easier for people coming from Delhi, Uttar Pradesh and Bihar.

For travellers from Delhi-NCR, the biggest highlight is the possibility of reaching Nepal in around eight hours, thanks to improved expressway and highway connectivity.

Also Read: This Is The First City In The UK Charging Tourists An Extra 5% To Stay Overnight

The Massive Project Connecting India And Nepal Is Almost Ready 

Photo: Pexels

India has been building highways at a rapid pace, and this one is especially important because it connects two countries. The new highway runs from Gorakhpur to Sonauli, one of the busiest border crossings between India and Nepal. Every day, thousands of tourists, pilgrims, traders, buses and trucks use this route to cross into Nepal.

Until now, the journey has not been easy. The old road is only two lanes wide and passes through busy towns and markets. Long traffic jams, slow-moving trucks and bottlenecks are common, especially during holidays and festival seasons. That is exactly what this project aims to fix.

Advertisement

The old two-lane road is being transformed into a 79.5-km modern four-lane highway that is built for faster and safer travel. According to the National Highways Authority of India (NHAI), nearly 89% of the construction work is already complete, bringing the project much closer to opening. The road has also been designed so it can be expanded to six lanes in the future if traffic increases.

Also Read: Ahead Of Onam Rush, Bengaluru-Ernakulam Vande Bharat Doubles Seating Capacity

The Biggest Benefit Is Less Time On The Road

If you've travelled towards Nepal before, you probably know that the stretch between Gorakhpur and Sonauli can be frustrating. Once the new highway opens, that travel time is expected to come down significantly. For people travelling from Delhi, Noida, Ghaziabad, Lucknow or different parts of Bihar, it means a much faster journey to the Nepal border.

Advertisement

The project has been built with several modern features that will make driving easier and safer. The new corridor includes a railway bridge, two flyovers, 24 underpasses, 105 culverts, and around 68 km of service roads. On top of that, it will also have an Advanced Traffic Management System (ATMS). That means CCTV cameras will monitor traffic, electronic message boards will provide updates, emergency call boxes will help people in distress and real-time traffic monitoring will improve road safety.

With nearly 89% of the construction already completed, the Gorakhpur-Sonauli highway is now entering its final phase.

Featured Video Of The Day
Inside Story: How Centre Got Sonam Wangchuk To End His Hunger Strike