Often dubbed as "naughty boy" for its spotty success rate, the Geosynchronous Satellite Launch Vehicle-II of ISRO has earned new sobriquets such as "mature", "obedient", "smarty" and "natty" after two consecutive successful launches.
The GSLV on Saturday placed the INSAT-3DS satellite in the Geosynchronous Transfer Orbit (GTO), the second successful mission after it placed the NVS-01 satellite for India's own satellite-based navigation system NavIC.
"Coming to the launch vehicle, GSLV doesn't have a good name ('Naughty Boy') with regards to its performance, but that has been a thing of the past. So far, the rocket and satellites have performed very well," ISRO Chairman S Somanath said, addressing reporters after the successful launch of INSAT-3DS.
Mission Director Tomy Joseph said, "The naughty boy has matured as a very obedient and disciplined boy." "Like PSLV (Polar Satellite Launch Vehicle), GSLV has also become a robust vehicle for ISRO," he said, remarks that were welcomed with applause.
Vikram Sarabhai Space Centre Director S Unnikrishnan Nair described the GSLV as "smarty" and "natty" and said the reliability of the launch vehicle was high like other rockets.
U R Rao Satellite Centre Director M Sankaran likened the GSLV to a "matured wine" which delivered a textbook performance by placing the INSAT-3DS satellite in orbit.
GSLV used the indigenously developed Cryogenic Upper Stage, generating a nominal thrust of 75 kiloNewton, which enabled ISRO launch up to two tonne class of communication satellites.
The first development flight of GSLV took place on April 18, 2001 followed by another development flight on May 8 2003.
The GSLV saw some back-to-back failures in 2006, when it failed to place the INSAT-4C satellite in orbit. Two GSLV missions in 2010 ended in a failure.
ISRO developed the GSLV-Mark III launch vehicle powered with the indigenously built cryogenic engine (C25) by the Liquid Propulsion Systems Centre at Thiruvananthapuram. GSLV Mark III, renamed as Launch Vehicle Mark III (LVM3) can place up to four tonne satellites in GTO and eight tonne payloads in low earth orbits.
(Except for the headline, this story has not been edited by NDTV staff and is published from a syndicated feed.)
Featured Video Of The Day
Gaganyaan Scheduled for 2026, Chandrayaan-4 to Launch by 2028: ISRO All You Need To Know About NASA-ISRO Mission's Radar Antenna Reflector NISAR Mission 2025: NASA and ISRO Join Forces to Monitor Earth's Ecosystems and Surface Changes Walmart Employee's Big Claim After Indian-Origin Teen Found Dead In Oven Who Was Gursimran Kaur, Indian Teen Found Dead In Walmart Oven Businessman's Rs 1 Crore Rolex Gift To Contractor For Building His "Fortress" North Korea Says It Test-Fired Latest ICBM Hwasong-19 On Thursday Ex-Armyman Opens Fire At Man Over Parking Dispute In Pune; Arrested US Elections: 60 Million Cast Early Votes In Kamala Harris-Trump Tight Race Track Latest News Live on NDTV.com and get news updates from India and around the world.