The Bairabi-Sairang railway line in Mizoram is ready for operation after 26 years of planning The 51.38 km line includes 48 tunnels and over 40 bridges, crossing difficult terrain Travel time between Guwahati and Aizawl will reduce from 18 to under 12 hours by rail