Construction of the first 2.7-km undersea tunnel for the bullet train is complete The tunnel is part of the 21-km Mumbai-Ahmedabad High-Speed Rail corridor The MAHSR corridor will use Japanese Shinkansen technology with speeds up to 320 kmph