Key Facts About New Navi Mumbai Airport
By: NDTVNewsDesk
Image: File
The Navi Mumbai International Airport (NMIA) will be inaugurated by PM Modi tomorrow (October 8).
Image: File
The project is being developed in multiple phases by Navi Mumbai International Airport.
Image: File
The Adani Group has a 74% stake in it and the remaining 26% is with the Maharashtra government's land development authority CIDCO.
Image: File
The airport is located in Ulwe, Navi Mumbai - approximately 37 km from South Mumbai.
Image: File
In the initial phase, it will have capacity of handling 20 Million Passengers Per Annum (MPPA) and 90 MPPA in the final phase.
Image: File
It has four terminals (final phase) with initial phase featuring a single integrated terminal for domestic and international operations.
Image: File
It has a total area of 1,160 hectares with the architecture design inspired by Lotus.
Image: File
It has 12 sculptural feature columns and 17 mega columns - unseen pillars carrying the weight of the lotus roof canopies.
Image: File
ndtv.com